1,780 units authorized
+37.6% from 2024 (1,294 units).
64.6% in buildings with multiple housing units; 1,780 units in the reported-only series.
View county comparisonA statewide view of housing authorizations, with a closer look at Kitsap, King and Skagit. Explore every Washington county, compare annual activity, and understand what the numbers can—and cannot—tell you before planning a project.
Calculation: (statewide total − focus-county total) ÷ statewide total. These counties define our editorial focus, not a statistical sampling frame.
Statewide research matters beyond the first test areas. This finding describes where authorizations occurred; it does not establish demand for Davapprove or current product availability.
Our initial counties stay in focus within the statewide picture. These Census totals include cities within each county and should not be compared directly with a county department’s own permit-decision table.
+37.6% from 2024 (1,294 units).
64.6% in buildings with multiple housing units; 1,780 units in the reported-only series.
View county comparison-19.5% from 2024 (10,564 units).
70.5% in buildings with multiple housing units; 7,890 units in the reported-only series.
View county comparison-31.8% from 2024 (547 units).
55.0% in buildings with multiple housing units; 219 units in the reported-only series.
View county comparisonResearch coverage is broader than service coverage. Inclusion here does not mean that Davapprove’s screening rules, fees or maps have been verified for that county.
Compare 2024 and 2025 on the same basis. “Multi-unit share” means units in buildings with two or more units. A dash means no authorized units in the denominator; zero counts are retained.
| County | 2024 | 2025 | Change | Multi-unit share 2025 | Reported only 2025 |
|---|---|---|---|---|---|
| Adams | 85 | 33 | -61.2% | 6.1% | 33 |
| Asotin | 101 | 37 | -63.4% | 10.8% | 37 |
| Benton | 1,515 | 1,663 | +9.8% | 39.1% | 1,650 |
| Chelan | 762 | 783 | +2.8% | 61.0% | 783 |
| Clallam | 166 | 293 | +76.5% | 13.0% | 293 |
| Clark | 3,594 | 3,250 | -9.6% | 32.6% | 2,085 |
| Columbia | 7 | 5 | -28.6% | 0.0% | 5 |
| Cowlitz | 353 | 308 | -12.7% | 3.2% | 308 |
| Douglas | 230 | 303 | +31.7% | 25.7% | 295 |
| Ferry | 20 | 19 | -5.0% | 10.5% | 19 |
| Franklin | 974 | 768 | -21.1% | 52.0% | 99 |
| Garfield | 7 | 0 | -100.0% | — | 0 |
| Grant | 552 | 431 | -21.9% | 13.2% | 216 |
| Grays Harbor | 288 | 224 | -22.2% | 10.3% | 223 |
| Island | 402 | 209 | -48.0% | 13.4% | 209 |
| Jefferson | 147 | 218 | +48.3% | 8.7% | 218 |
| King Focus | 10,564 | 8,505 | -19.5% | 70.5% | 7,890 |
| Kitsap Focus | 1,294 | 1,780 | +37.6% | 64.6% | 1,780 |
| Kittitas | 434 | 288 | -33.6% | 16.7% | 278 |
| Klickitat | 79 | 102 | +29.1% | 5.9% | 102 |
| Lewis | 265 | 431 | +62.6% | 13.5% | 431 |
| Lincoln | 47 | 67 | +42.6% | 11.9% | 67 |
| Mason | 299 | 204 | -31.8% | 2.0% | 204 |
| Okanogan | 246 | 229 | -6.9% | 10.5% | 115 |
| Pacific | 94 | 64 | -31.9% | 0.0% | 64 |
| Pend Oreille | 55 | 58 | +5.5% | 0.0% | 58 |
| Pierce | 3,207 | 3,782 | +17.9% | 54.6% | 3,658 |
| San Juan | 100 | 81 | -19.0% | 0.0% | 81 |
| Skagit Focus | 547 | 373 | -31.8% | 55.0% | 219 |
| Skamania | 35 | 55 | +57.1% | 0.0% | 55 |
| Snohomish | 4,149 | 3,372 | -18.7% | 43.4% | 3,289 |
| Spokane | 3,626 | 2,976 | -17.9% | 53.8% | 1,915 |
| Stevens | 335 | 196 | -41.5% | 0.0% | 196 |
| Thurston | 1,222 | 1,669 | +36.6% | 55.5% | 1,419 |
| Wahkiakum | 23 | 21 | -8.7% | 38.1% | 21 |
| Walla Walla | 205 | 163 | -20.5% | 1.2% | 155 |
| Whatcom | 1,190 | 1,214 | +2.0% | 50.0% | 1,122 |
| Whitman | 44 | 26 | -40.9% | 15.4% | 26 |
| Yakima | 515 | 713 | +38.4% | 15.6% | 713 |
Reported-only counts are the source’s companion series, not a second set of additional units. Estimates can be higher because they include imputation for nonreporting offices. Do not add the columns together.
The Washington State Department of Commerce’s March 2023 projection estimated a need for 1.1 million additional homes by 2044. Link
Commerce’s same projection separately estimated approximately 91,360 emergency-housing units needed by 2044. Link
Washington State Department of Commerce, March 2, 2023 · checked 2026-11-28.
This is a dated planning projection, not a fresh estimate of the remaining shortfall. Housing need, annual authorizations and completed homes measure different things; we do not turn their difference into an annual deficit or assume all authorized homes are built.
The Davapprove Washington Housing Authorization Monitor uses all 39 Washington county records in each of the 2024 and 2025 Census annual files (78 county-year records), downloaded 2026-11-28. Census measures the underlying activity; Davapprove calculates changes, structure shares and the grouping outside our initial counties. No private customer or individual permit records are used.
We select state FIPS 53; sum the units fields for one-unit, two-unit, three-to-four-unit and five-or-more-unit structures; and check every category and the reported-only totals against the separate state files for both years. Changes use (current − prior) ÷ prior; a zero prior-year denominator produces no percentage. Percentages are rounded to one decimal.
For 2025, the U.S. Census Bureau files contain 30,331 reported-only Washington housing units versus 34,913 in the estimate including imputation, a difference of 4,582 units calculated by Davapprove. Link 2025 state annual file.
Census methodology · County file layout · State file layout · Inclusions and exclusions · Release notes.
Census provides comparable housing-authorization counts. Local agencies publish different measures of review time and workload. Commerce’s annual project-permit reporting program covers selected jurisdictions; it is not an all-county census of every building permit.
Source: Kitsap County DCD, 2025 Annual Performance Reporting, p. 1. Davapprove calculation; n = 46 reported decisions, reviewed 2026-11-20.
This concentration is a reason to check the permit categories behind a headline. It does not establish the experience of a new house, an ADU, or a specific parcel.
Kitsap County DCD’s 2025 annual performance table reports 46 decisions across its listed categories. Link
| Permit category | Decisions | Exceeded deadline |
|---|---|---|
| Preliminary subdivision | 13 | 13 |
| Final subdivision | 4 | 2 |
| Binding site plan | 1 | 1 |
| Multifamily housing permit | 20 | 18 |
| Construction permit | 8 | 7 |
| Total | 46 | 41 |
This edition does not publish a waiting-time estimate. The county PDF’s time-column labels appear inconsistent; we have not silently swapped them. Agency clarification is needed before interpreting those averages.
The county’s 2025 report says legacy projects affect its averages and that projects handled entirely under its newer review process are meeting timelines. That statement is the county’s assessment, not our independent validation.
Edition 2026 uses one public aggregate table covering decisions during 2025. We visually transcribed every category in the original county PDF on 2026-11-20, checked category sums against its total, and combined the multifamily and preliminary-subdivision counts. The calculation is (20 + 13) ÷ 46 × 100 = 71.7%, rounded to one decimal.
The county measured the counts. Davapprove selected the grouping and calculated its share. This is the first edition, with no trend comparison.
We do not yet have a defensible regional cost benchmark. Published permit fees, consultant quotes, impact charges and utility connections cover different scopes. A future study will separate those components and state its assumptions rather than present an incomplete subtotal as a typical project cost.
Davapprove is being developed with beta testers. Its initial product line is still being finalized. These findings do not demonstrate product savings, determine buildability or authorize work.
2026-11-28: Expanded to all Washington counties with 2024–2025 Census comparisons, a statewide named analysis, focus-county profiles, housing-need context and downloadable data. Preserved the Kitsap case study and its original research date. Statewide research does not imply statewide product readiness.
2026-11-20: Initial draft, source transcription and reproducible permit-mix calculation. Timeline estimates withheld pending clarification. No prior edition or trend is claimed.